Please Enter Validation Code: 3gD7z 

Head Office

VESK Ltd

1st Floor Albion Mills

18 East Tenter Street

Tower Hill

London

E1 8DN

United Kingdom

 

Telephone: 0845 555 8375

Outside UK: +44 207 488 3355

Our Datacentres

Internal Datacentre Resilience

Internally within each server rack in our datacentres we operate n+2 redundancy across our servers.  That means a server, or even two servers can fail at any one point in time and new servers are waiting to takeover the faulty servers.

Within our storage we also run n+2.  That means any storage unit (SAN) can fail and we have immediate failover to another SAN, in fact you wouldn’t even notice a failure if working on a document.

All networking equipment is mirrored, not only on a per-switch basis, but across multiple network switches.  Our firewalls are mirrored resulting in immediate failover in the event of any part of our network failing.

We have multiple honed Internet connectivity into each datacentre from different providers.

We have dual feed electricity from the National Grid in addition to a third party power supplier.  Furthermore we have petrol and diesel generators and operate the only n+2 power datacentre facility in the UK.

We do not have any single points of failure internally within our datacentres.

 

Collective datacentre resilience

Your data on VESK is not only backed up offsite, it’s synchronised in real-time between datacentres.  Every ‘bit’ of data held in datacentre 1 is replicated across multiple datacentres, in real time.

Fast multiple 1gbps connections interconnect our datacentres using a secured and uncontended pathway.In the event of a complete datacentre failure, a backup datacentre will be initiated.

 

Disaster recovery

VESK offer as standard, full Disaster Recovery between datacentres.  This involves real-time bidirectional synchronisation of all VESK data across multiple datacentres with error checking at both ends.  All data in transit is encapsulated, encrypted and decrypted for security purposes.

Not only do we synchronise your data in real time, we also snapshot your data every hour.  That means we can recover emails, files and even database applications back to any ‘hourly’ point in time.

 

Compliance

All VESK datacentres are ISO27001 certified, please ask a member of the technical team for our certificates.

VESK are compliant with ISO27001 and ISO9001 for data integrity and data security.  We are part of the DPA; VESK Data Protection Act number: Z194376X.

 

100% carbon neutral

On March 23rd 2012 VESK became the UK’s first hosted desktop provider to take a crucial step to make our operations more environmentally friendly. On behalf of all clients, VESK is voluntarily offsetting all the CO2 emissions caused by our primary datacentreOverall, this equates to a 30% increase in our overall datacentre costs, but a highly strategic move in increasing our overall business efficiency.

 

A few special datacentre features

 

James Mackie, our Technical Director at our primary datacentre facility in the US.  Behind James you can see the NOC, Network Operations Centre where all of VESK’s US infrastructure is monitored.

 

Unlike many other datacentre’s, VESK’s server cabinets have their own fire suppression units.  If there’s a fire only one cabinet is affected, rather than an entire area.

 

 

Each of our cabinets has its own power supplied from multiple sources. Unlike many other datacentre’s we can supply over 100Amps to each cabinet for maximum compute requirements.

 

Each row in our primary datacentre has its own internal cooling through sealed cabinets.  Each cabinet circulates the cool air from top to bottom, so unlike other datacentre’s, ours is completely silent!

 

News

GREEN IT AWARDS small

VESK Named Green IT Awards Winner

VESK Win “Environmental Project of the Year” Award. On the [...]

May 16, 2013

CWF2013

Cloud World Forum 2013, London

Join VESK at CWF2013 in London on 26th-27th June 2013. [...]

May 2, 2013

vesk_webinar

On-Demand Webinar: Live Case Study

Cloud IT for Recruitment: A Live Case Study Webinar With [...]

March 21, 2013

Gcloud

UK Government Ready to Embrace the Cloud

G-Cloud Announce ‘Cloud First’ Mandate . The UK government introduced theG-Cloud [...]

March 25, 2013

Green IT

VESK Named Green IT Awards Finalist

VESK selected as a finalist for three Green IT Awards [...]

March 21, 2013

Legal IT

EVENT: Legal IT Business Show 2013

Join VESK at the Legal IT Business Show 2013   [...]

February 25, 2013

vesk_webinar

WEBINAR: Cloud IT for Recruitment

Cloud IT for Recruitment: A Live Case Study Webinar With [...]

February 14, 2013

2e2-go-into-administration

2e2 Go Into Administration

VESK help migrate data for 2e2 customers. A sign of [...]

February 7, 2013

Case Studies

FTN

NHS Foundation Trust Network

VESK Win NHS Tender. The Foundation Trust Network (FTN) is [...]

August 23, 2012

refugee council

The British Refugee Council

The British Refugee Council have cut costs by around 35% [...]

April 20, 2012

AMarsden logo

Astbury Marsden

Astbury Marsden to cut IT costs by 40% with VESK [...]

December 10, 2010

Crisis

Crisis at Christmas

VESK Provide 260 Hosted Virtual Desktops to Leading UK Charity. [...]

January 5, 2013

TandT logo

TandT Recruit Solutions

TandT Recruitment Solutions are one of the UK’s leading specialist Travel [...]

December 18, 2012

LS LOGO

Lauriston Saggar

Lauriston Saggar Choose VESK Hosted Virtual Desktops Lauriston Saggar are [...]

October 15, 2012

Guarding UK

Guarding UK

Seamless migration to the cloud aids growth and productivity whilst [...]

November 8, 2011

Galliard Homes Logo

Galliard Homes

Galliard Homes reduce IT management costs by around 40%. Galliard [...]

November 15, 2010

Tweets

  • Twitter feed loading

Connect to technician